Portfolio Category: Environmental

River Bank Stabilization

North American Construction was contracted by the property owner to perform an emergency bank stabilization to protect and replace a failing bank that was jeopardizing the stability of the house and septic system at the top of the bank. The owner had previously lost approximately 40 feet of bank prior to this stabilization project....
Read more